Please use this identifier to cite or link to this item: https://hdl.handle.net/11147/6734
Full metadata record
DC FieldValueLanguage
dc.contributor.authorKüçükateş Ömüral, Neslihan-
dc.contributor.authorDemirörs, Onur-
dc.date.accessioned2018-01-24T10:43:15Z-
dc.date.available2018-01-24T10:43:15Z-
dc.date.issued2017-
dc.identifier.citationKüçükateş Ömüral, N., and Demirörs, O. (2017). Effort estimation methods for ERP projects based on function points: A case study. Paper presented at the 27th International Workshop on Software Measurement and 12th International Conference on Software Process and Product Measurement. doi:10.1145/3143434.3143464en_US
dc.identifier.issn9.78E+12-
dc.identifier.urihttp://doi.org/10.1145/3143434.3143464-
dc.identifier.urihttp://hdl.handle.net/11147/6734-
dc.description27th International Workshop on Software Measurement and 12th International Conference on Software Process and Product Measurement, IWSM Mensura 2017; Gothenburg; Sweden; 25 October 2017 through 27 October 2017en_US
dc.description.abstractEnterprise Resource Planning (ERP) Systems evolve at a rapid pace based on customer and industry expectations. As a result, historic project data for these kinds of projects lose their value especially for analogy based estimation methods. In this rapidly evolving domain, function point based methods might provide a sound alternative for ERP effort estimation. This paper presents the results obtained by applying three methods published in the literature in which function points are used as an input for ERP effort estimation. The evaluation of these methods with respect to their measurement processes and estimation errors are presented; their advantages and disadvantages are discussed.en_US
dc.language.isoenen_US
dc.publisherAssociation for Computing Machinery (ACM)en_US
dc.relation.ispartof27th International Workshop on Software Measurement and 12th International Conference on Software Process and Product Measurementen_US
dc.rightsinfo:eu-repo/semantics/openAccessen_US
dc.subjectEffort estimationen_US
dc.subjectEnterprise Resource Planningen_US
dc.subjectFunction pointsen_US
dc.subjectSoftware engineeringen_US
dc.subjectResource allocationen_US
dc.titleEffort estimation methods for ERP projects based on function points: A case studyen_US
dc.typeConference Objecten_US
dc.authoridTR167231en_US
dc.institutionauthorDemirörs, Onur-
dc.departmentİzmir Institute of Technology. Computer Engineeringen_US
dc.identifier.volumePart F131936en_US
dc.identifier.startpage199en_US
dc.identifier.endpage206en_US
dc.identifier.scopus2-s2.0-85038407640en_US
dc.relation.publicationcategoryKonferans Öğesi - Uluslararası - Kurum Öğretim Elemanıen_US
dc.identifier.doi10.1145/3143434.3143464-
dc.relation.doi10.1145/3143434.3143464en_US
dc.coverage.doi10.1145/3143434.3143464en_US
dc.identifier.wosqualityN/A-
dc.identifier.scopusqualityN/A-
item.fulltextWith Fulltext-
item.grantfulltextopen-
item.languageiso639-1en-
item.openairecristypehttp://purl.org/coar/resource_type/c_18cf-
item.cerifentitytypePublications-
item.openairetypeConference Object-
crisitem.author.dept03.04. Department of Computer Engineering-
Appears in Collections:Computer Engineering / Bilgisayar Mühendisliği
Scopus İndeksli Yayınlar Koleksiyonu / Scopus Indexed Publications Collection
Files in This Item:
File Description SizeFormat 
6733.pdfConference Paper821.18 kBAdobe PDFThumbnail
View/Open
Show simple item record



CORE Recommender

SCOPUSTM   
Citations

5
checked on Nov 15, 2024

Page view(s)

190
checked on Nov 18, 2024

Download(s)

2,250
checked on Nov 18, 2024

Google ScholarTM

Check




Altmetric


Items in GCRIS Repository are protected by copyright, with all rights reserved, unless otherwise indicated.