Please use this identifier to cite or link to this item:
https://hdl.handle.net/11147/6272
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Gerçek, Bilge | - |
dc.contributor.author | Tokdemir, Onur Behzat | - |
dc.contributor.author | İlal, Mustafa Emre | - |
dc.contributor.author | Günaydın, Hüsnü Murat | - |
dc.date.accessioned | 2017-09-18T13:47:37Z | |
dc.date.available | 2017-09-18T13:47:37Z | |
dc.date.issued | 2017 | |
dc.identifier.citation | Gerçek, B., Tokdemir, O. B., İlal, M. E. and Günaydın, H.M. (2017, July). BIM execution process of construction companies for building projects. Paper presented at the 9th International Structural Engineering and Construction Conference: Resilient Structures and Sustainable Construction, Universitat Politecnica de Valencia, Spain. | en_US |
dc.identifier.isbn | 9780996043748 | |
dc.identifier.uri | http://hdl.handle.net/11147/6272 | |
dc.description.abstract | Building Information Modeling (BIM) has been an emerging concept in architecture, engineering and construction (AEC) industry with a vast amount of promising benefits to construction projects. Implementation of BIM, however, requires comprehensive research and strategic planning. Industry-wide and organizational implementation guidelines and standards have been published around the world either to encourage organizations to adopt BIM or to present the minimum requirements to be followed where BIM implementation is a statutory obligation. In contrast, governments or organizations in several countries such as Turkey have not mandated BIM implementation and provide no guidance. Organizations in these countries which plan to adopt BIM processes are forced to develop their own implementation plans. The purpose of this study is to provide guidance in BIM implementation for construction companies in countries where BIM implementation has not been mandated particularly during the construction phase of the building projects. 23 BIM standards and guidelines covering the BIM execution process have been reviewed. Topics that need to be addressed by BIM implementation plans have been identified and categorized under four headings. A case study of BIM implementation at a large construction company that focuses on conducting quantity takeoff and cost estimation is presented, and unique challenges of BIM implementation in Turkish AEC industry are discussed. | en_US |
dc.language.iso | en | en_US |
dc.publisher | ISEC Press | en_US |
dc.relation.ispartof | 9th International Structural Engineering and Construction Conference: Resilient Structures and Sustainable Construction, ISEC 2016 | en_US |
dc.rights | info:eu-repo/semantics/openAccess | en_US |
dc.subject | Building Information Modeling | en_US |
dc.subject | Construction management | en_US |
dc.subject | BIM guidelines | en_US |
dc.subject | BIM implementation | en_US |
dc.subject | Execution plan | en_US |
dc.title | BIM execution process of construction companies for building projects | en_US |
dc.type | Conference Object | en_US |
dc.authorid | TR131553 | en_US |
dc.institutionauthor | Gerçek, Bilge | - |
dc.institutionauthor | İlal, Mustafa Emre | - |
dc.department | İzmir Institute of Technology. Architecture | en_US |
dc.identifier.scopus | 2-s2.0-85027841717 | en_US |
dc.relation.publicationcategory | Konferans Öğesi - Uluslararası - Kurum Öğretim Elemanı | en_US |
local.message.claim | 2022-06-04T18:55:33.459+0300 | * |
local.message.claim | |rp02902 | * |
local.message.claim | |submit_approve | * |
local.message.claim | |dc_contributor_author | * |
local.message.claim | |None | * |
dc.identifier.wosquality | N/A | - |
dc.identifier.scopusquality | N/A | - |
item.openairecristype | http://purl.org/coar/resource_type/c_18cf | - |
item.grantfulltext | open | - |
item.cerifentitytype | Publications | - |
item.fulltext | With Fulltext | - |
item.openairetype | Conference Object | - |
item.languageiso639-1 | en | - |
crisitem.author.dept | 02.02. Department of Architecture | - |
crisitem.author.dept | 02.02. Department of Architecture | - |
Appears in Collections: | Architecture / Mimarlık Scopus İndeksli Yayınlar Koleksiyonu / Scopus Indexed Publications Collection |
CORE Recommender
SCOPUSTM
Citations
4
checked on Nov 23, 2024
Page view(s)
764
checked on Nov 18, 2024
Download(s)
736
checked on Nov 18, 2024
Google ScholarTM
Check
Altmetric
Items in GCRIS Repository are protected by copyright, with all rights reserved, unless otherwise indicated.