Please use this identifier to cite or link to this item:
https://hdl.handle.net/11147/9253
Title: | Dynamic Analysis of an Immersed Tunnel in Izmir; | Other Titles: | Análisis dinámico de un túnel sumergido en Izmir | Authors: | Egeli,I. Gurbuz,C. |
Keywords: | Dynamic 2-d analysis Earthquake response of subsea tunnels Immersed tube tunnel Soil-tunnel interaction |
Publisher: | Pontificia Universidad Catolica de Chile, Escuela de Construccion Civil | Abstract: | The original design of the planned Izmir Bay Immersed Tube Tunnel, considered it to be a continuous subsea tunnel for the whole length of about 7.6 km. But this was later changed into having 2 shorter tubes of 2.7 km long each connected thru’ a 2.2 km long artificial island created in the middle of the bay from the excess dredged material, a concept which also reduces costs and increases efficiency. This island will serve as a venue for the 2025 Expo Exhibition, which Izmir city will apply to organize in the future. Reason for the research study was to provide a preliminary design, using a dynamic analysis, during the current pre-feasibility stage, of the immersed tunnel to show whether it can be built across the Izmir Bay. This paper takes into account the new alignment and presents the results of a 2-D dynamic analysis conducted of the prefabricated 100m long tunnel elements, sitting within a backfilled dredged ditch, dug after the recommended ground improvement was carried out. Analyses considered staged construction and the results showed that: Tunnel units and its surrounding soils inside the dredged ditch act together to provide a better earthquake response with a damping effect of the earthquake force; Tunnel units do not float to the sea surface, but continued to stay inside the dredged ditch and applied positive stresses to the foundations during the design earthquakes. As there was no floating, there was no need for anchoring the tunnel to ditch bottom; Tunnel units and immersion joints (made of specified strong elastomer material) continued to stay in compression longitudinally and provided a superb water-tightness level; There were no risky (un-tolerable) ground deformations during, after striking of the design earthquakes. Total vertical and differential displacements of the tunnel units and in the surrounding soils were all at acceptable levels; Concrete surface crack widths occurring in the tunnel units, during striking of the design earthquakes were also found to be allowable. Study results show that the tunnel elements can withstand Mw=7 short duration (<10 sec) or Mw=6 long duration (>10 sec) earthquakes without major damages to their structure © 2018. Revista de la Construccion. All rights reserved. | URI: | https://doi.org/10.7764/RDLC.17.1.103 | ISSN: | 0717-7925 |
Appears in Collections: | Civil Engineering / İnşaat Mühendisliği Scopus İndeksli Yayınlar Koleksiyonu / Scopus Indexed Publications Collection WoS İndeksli Yayınlar Koleksiyonu / WoS Indexed Publications Collection |
Files in This Item:
File | Size | Format | |
---|---|---|---|
13774-Article Text-26886-1-10-20200512.pdf | 844.66 kB | Adobe PDF | View/Open |
CORE Recommender
SCOPUSTM
Citations
4
checked on Jan 10, 2025
WEB OF SCIENCETM
Citations
3
checked on Jan 4, 2025
Page view(s)
1,118
checked on Jan 13, 2025
Download(s)
176
checked on Jan 13, 2025
Google ScholarTM
Check
Altmetric
Items in GCRIS Repository are protected by copyright, with all rights reserved, unless otherwise indicated.