Please use this identifier to cite or link to this item: https://hdl.handle.net/11147/3563
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorÖzkol, Ünver-
dc.contributor.authorTemiz, Aktan-
dc.date.accessioned2014-07-22T13:51:49Z-
dc.date.available2014-07-22T13:51:49Z-
dc.date.issued2013-
dc.identifier.urihttp://hdl.handle.net/11147/3563-
dc.descriptionThesis (Master)--Izmir Institute of Technology, Energy Engineering, Izmir, 2013en_US
dc.descriptionIncludes bibliographical references (leaves: 45)en_US
dc.descriptionText in English; Abstract: Turkish and Englishen_US
dc.descriptionx, 86 leavesen_US
dc.description.abstractAim of this thesis is to overview a methodology for selecting the best fit turbine type which is one of the most important part of run-of-river hydroelectric power plants and to apply this methodology on a case study of Eglence-1 HEPP. Basically, in a Hydopower Plant, Hydro-turbines convert water pressure and its kinetic energy into mechanical shaft power which can be used to drive generators for electrical energy production. There are different turbine types which operates at different rated flows and net heads. The type, geometry and dimensions of a turbine are selected by net head, range of discharges through the turbine, rotational speed, cavitation problems and cost. One of the main disadvantages of run-of-river HEPP is that they have not enough reservoir, but there is a considerable storage capacity in our case scenario. So, by the help of this reservoir, only Francis turbine alternatives have been studied for Eglence-I HEPP. If there would not exist such a reservoir then we had to choose at least one small Pelton type turbine which is more suitable for the flow variations are large and stay in the lower range of design flow. At the last part of thesis, the cost and benefit estimations for a techno-economic evaluation of Eglence-1 HEPP has been discussed to show that this investment earns enough money during its lifetime. All hydroelectric power plants can be considered as tailor-made for each unique application and different alternatives for unique plant can be recommended for various operating conditions.en_US
dc.language.isoenen_US
dc.publisherIzmir Institute of Technologyen_US
dc.rightsinfo:eu-repo/semantics/openAccessen_US
dc.subject.lcshHydroelectric power plantsen
dc.subject.lcshHydroelectric generatorsen
dc.subject.lcshHydraulic turbinesen
dc.titleDecision Making on Turbine Types and Capacities for Run-Of Hydroelectric Power Plants a Case Study on Eglence-1 Heppen_US
dc.typeMaster Thesisen_US
dc.institutionauthorTemiz, Aktan-
dc.departmentThesis (Master)--İzmir Institute of Technology, Energy Systems Engineeringen_US
dc.relation.publicationcategoryTezen_US
dc.identifier.wosqualityN/A-
dc.identifier.scopusqualityN/A-
item.openairecristypehttp://purl.org/coar/resource_type/c_18cf-
item.languageiso639-1en-
item.openairetypeMaster Thesis-
item.grantfulltextopen-
item.fulltextWith Fulltext-
item.cerifentitytypePublications-
Appears in Collections:Master Degree / Yüksek Lisans Tezleri
Files in This Item:
File Description SizeFormat 
T001094.pdfMasterThesis3.59 MBAdobe PDFThumbnail
View/Open
Show simple item record



CORE Recommender

Page view(s)

314
checked on Mar 31, 2025

Download(s)

154
checked on Mar 31, 2025

Google ScholarTM

Check





Items in GCRIS Repository are protected by copyright, with all rights reserved, unless otherwise indicated.