Please use this identifier to cite or link to this item:
https://hdl.handle.net/11147/3376
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.advisor | Özerdem, Mehmet Barış | en |
dc.contributor.author | Özer, Serra | - |
dc.date.accessioned | 2014-07-22T13:51:24Z | - |
dc.date.available | 2014-07-22T13:51:24Z | - |
dc.date.issued | 2004 | en |
dc.identifier.uri | http://hdl.handle.net/11147/3376 | - |
dc.description | Thesis (Master)--Izmir Institute of Technology, Mechanical Engineering, Izmir, 2004 | en |
dc.description | Includes bibliographical references (leaves: 116-120) | en |
dc.description | Text in English; Abstract: Turkish and English | en |
dc.description | xi, 124 leaves | en |
dc.description.abstract | Feasibility studies have been done for different scenarios on IZTECH campus area where previous wind data evaluation showed considerable wind potential. RET Screen software has been used for feasibility calculations. Internal rate of return and unit cost of energy have been examined for the proposed scenarios. First scenario represents an autoproducer model which would meet IZTECH.s electricity need. Two 600 kW turbines were used in this scenario and the unit cost of energy have calculated as 24 cents/kWh.Second scenario represents an autoproducer group. Two units with 900 kW rated power turbines were used in the scenario and 4.82 cents/kWh is found as unit energy cost. Finally, third and last scenario is planned as production plant with thirteen 900 kW turbines. The energy unit cost would be 2.68 cents/kWh when scenario is applied. This study showed that IZTECH campus area which was inspected before for wind data characteristic and technical potential point of view, found economically viable too. Within the finance models, project finance and syndicated loan credit were examined as the most convenient mechanisms. | en |
dc.language.iso | en | en_US |
dc.publisher | Izmir Institute of Technology | en |
dc.rights | info:eu-repo/semantics/openAccess | en_US |
dc.subject.lcc | TJ820 .O99 2004 | en |
dc.subject.lcsh | Wind power--Turkey | en |
dc.title | A feasibility study and evaluation of financing models for Wind Energy Projects: A case study on Izmir Institute of Technology Campus area | en_US |
dc.type | Master Thesis | en_US |
dc.institutionauthor | Özer, Serra | - |
dc.department | Thesis (Master)--İzmir Institute of Technology, Mechanical Engineering | en_US |
dc.relation.publicationcategory | Tez | en_US |
item.fulltext | With Fulltext | - |
item.grantfulltext | open | - |
item.languageiso639-1 | en | - |
item.openairecristype | http://purl.org/coar/resource_type/c_18cf | - |
item.cerifentitytype | Publications | - |
item.openairetype | Master Thesis | - |
Appears in Collections: | Master Degree / Yüksek Lisans Tezleri |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
T000490.pdf | MasterThesis | 1.48 MB | Adobe PDF | View/Open |
CORE Recommender
Page view(s)
270
checked on Nov 18, 2024
Download(s)
268
checked on Nov 18, 2024
Google ScholarTM
Check
Items in GCRIS Repository are protected by copyright, with all rights reserved, unless otherwise indicated.