Please use this identifier to cite or link to this item: https://hdl.handle.net/11147/3049
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorÖzkol, Ünver-
dc.contributor.authorKonyalı, Ayşe-
dc.date.accessioned2014-07-22T13:50:47Z-
dc.date.available2014-07-22T13:50:47Z-
dc.date.issued2010-
dc.identifier.urihttp://hdl.handle.net/11147/3049-
dc.descriptionThesis (Master)--Izmir Institute of Technology, Energy Engineering, Izmir, 2010en_US
dc.descriptionIncludes bibliographical references (leaves: 57-60)en_US
dc.descriptionText in English; Abstract: Turkish and Englishen_US
dc.descriptionx, 60 leavesen_US
dc.description.abstractA capacity increase is of concern in the Kızıldere Geothermal Power Plant-the first geothermal plant in Turkey. In this study, the feasibility of possible future investments in Kızıldere has been analyzed financially using methods such as internal rate of return, net present value, payback and benefit-cost. Two scenarios with different financial structures have been formed and both scenarios have been applied to 20MW, 40 MW, and 60 MW power plants. The choice among different alternatives has been made according to the unit energy cost, which is a significant parameter in power plants. The first scenario represents a government project which establishes the project finance on a debt ratio of 75%. The debt term has been taken as 12 years and the debt interest rate as 7%. In this scenario, unit energy cost has been estimated as 4,33 cent/kWh for 20 MW, 4,10 cent/kWh for 40 MW and finally 3,88 cent/kwh for 60 MW. The second scenario represents a private project with a debt ratio of 50%, where the debt term is 8 years and the debt interest rate is taken as 5%. As for the unit energy cost for this particular scenario, it has been estimated as 3.8 cent/ kWh, 3.59 cent/kWh and 3.40 cent/kWh for 20 MW, 40 MW and 60 MW respectively. Kızıldere geothermal Plant has been financially evaluated in this study and it has been concluded that although both scenarios are feasible, the best alternative is 60MW private project.en_US
dc.language.isoenen_US
dc.publisherIzmir Institute of Technologyen_US
dc.rightsinfo:eu-repo/semantics/openAccessen_US
dc.subject.lcshGeothermal power plantsen
dc.subject.lcshGeothermal resources--Turkeyen
dc.subject.lcshGeothermal engineeringen
dc.titleFinancial Evaluation Of Kızıldere Geothermal Power Planten_US
dc.typeMaster Thesisen_US
dc.institutionauthorKonyalı, Ayşe-
dc.departmentThesis (Master)--İzmir Institute of Technology, Energy Systems Engineeringen_US
dc.relation.publicationcategoryTezen_US
dc.identifier.wosqualityN/A-
dc.identifier.scopusqualityN/A-
item.openairecristypehttp://purl.org/coar/resource_type/c_18cf-
item.grantfulltextopen-
item.openairetypeMaster Thesis-
item.languageiso639-1en-
item.cerifentitytypePublications-
item.fulltextWith Fulltext-
Appears in Collections:Master Degree / Yüksek Lisans Tezleri
Files in This Item:
File Description SizeFormat 
T000008.pdfMasterThesis1.52 MBAdobe PDFThumbnail
View/Open
Show simple item record



CORE Recommender

Page view(s)

260
checked on Dec 23, 2024

Download(s)

160
checked on Dec 23, 2024

Google ScholarTM

Check





Items in GCRIS Repository are protected by copyright, with all rights reserved, unless otherwise indicated.