Please use this identifier to cite or link to this item: https://hdl.handle.net/11147/14658
Title: Hydrokinetic power potential assessment of the Çoruh River Basin
Authors: Karakaya, Derya
Ozturk, Bahadir
Elci, Sebnem
Keywords: Renewable energy
Hydrokinetic energy
SWAT model
HEC-RAS
Water turbine
Power density
Publisher: Elsevier
Abstract: Hydrokinetic power contributes to energy security by a sustainable and predictable power source, and its decentralized nature fosters economic development in local communities. Unlike large-scale hydropower projects, hydrokinetic power has lower environmental impacts, promoting technological innovation and supporting the transition to cleaner energy systems. Furthermore, it pledges to guarantee electricity in isolated regions where traditional power systems are not suited, enhancing energy accessibility. This study presents a method that combines the Soil and Water Assessment Tool (SWAT) with the Hydrologic Engineering Center's River Analysis System (HEC-RAS) to forecast the hydrokinetic power capacity of a basin. The research site chosen is the & Ccedil;oruh River, a transboundary river basin with unavailable publicly accessible flow data. This method approximates the flow data utilizing the SWAT model, which relies on hydrological factors. Following the prediction of the flow data in the basin, the HECRAS model simulates the river's hydraulic conditions to estimate hydrokinetic energy potential. This integrated methodology provides a framework for optimizing hydrokinetic resources in diverse settings, guiding resource management, and sustainable energy planning. This study calculated theoretical hydrokinetic energy potential by considering flow velocity values. Results of the study indicated that the average flow velocity in the & Ccedil;oruh basin reaches its maximum value of 0.99 m/s in spring and its minimum value of 0.69 m/s in summer, respectively. Based on the seasonal analysis of the integrated approach, the highest maximum theoretical hydrokinetic power density in the basin reaches 26 kW/m2 during the spring and in subbasins 5, 7, and 8. The average theoretical hydrokinetic power density is calculated as 0.28 kW/m2. Finally, the study presents several potential locations along the & Ccedil;oruh River through GIS mapping, where small-scale hydrokinetic turbines could be installed as a viable option.
Description: Ozturk, Bahadir/0000-0002-1640-809X; Elci, Sebnem/0000-0002-9306-1042
URI: https://doi.org/10.1016/j.esd.2024.101533
https://hdl.handle.net/11147/14658
ISSN: 0973-0826
2352-4669
Appears in Collections:Scopus İndeksli Yayınlar Koleksiyonu / Scopus Indexed Publications Collection
WoS İndeksli Yayınlar Koleksiyonu / WoS Indexed Publications Collection

Show full item record



CORE Recommender

Page view(s)

12
checked on Oct 14, 2024

Google ScholarTM

Check




Altmetric


Items in GCRIS Repository are protected by copyright, with all rights reserved, unless otherwise indicated.